Main process:

Sanitary wares Production Process

Raw material storage
  • 夢佳衛浴
Raw material weighing
  • 夢佳衛浴
Raw material ball-grinding
  • 夢佳衛浴
  • 夢佳衛浴
Design and mould making
  • 夢佳衛浴
Mud preparation and storage
  • 夢佳衛浴
  • 夢佳衛浴
Semi-auto high-pressure casting line
  • 夢佳衛浴
Semi-auto high-pressure cistern casting line
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
Drying
  • 夢佳衛浴
Semi-finished products inspection
  • 夢佳衛浴
  • 夢佳衛浴
Glazing
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
Loading & Firing
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
Final products inspection (including cold processing ) all the qualified products are sent to the warehouse. Partial unqulified products will be refired and then reinspected again . If ok, then sent to the warehouse , If not , will be distroied.
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
COPYRIGHT ? 2018 MONGA ALL RIGHTS RESERVED Design By Weipai
中国胆王3d今晚预测 福彩快三全国统一开奖网 体彩开奖直播频道 上海时时乐和值 北京pk拾彩票网官网APP下载 广西11选5开奖结果 百度理财平台入门 三羊期货配资 河南481开奖 山西快乐十分近50期走势图 闲钱如何理财 浙江十一选五开奖奖金 河南快三走势图一定牛012 免费下载四川金7乐 天津时时彩15期开奖结果 佳永配资 投资金融 甘肃福彩快三